Table 3: Correlational data between assessed power output and finish time.
Variable | Significance | r value | Z transformation | 95 % CI Lower | 95 % CI Upper |
Power Canoe Left (n = 35) | 0.041 | 0.449 | 0.483 | 0.179 | 0.703 |
Power Canoe Right (n = 35) | 0.041 | 0.449 | 0.483 | 0.179 | 0.703 |
Power Average Canoe (n = 35) | 0.034 | 0.548 | 0.615 | 0.355 | 0.786 |
Power Kayak (n = 15) | 0.021 | 0.632 | 0.745 | 0.377 | 0.909 |